Sample Application for Transmission Right of Way Use

Application Number

For office use only
Date Received



Transmission Right of Way Use Guidelines are subject to change without notice. Applicant will be held to the guidelines in effect a the time the application is received by Progress Energy.

Applicant

Is this application the result of a violation notice? If so, attach a copy of the notice.

Date
Applicant (Individual or firm to be named in the agreement)
Address
City
State
Zip
Email Address
Phone Number
Fax Number
Mobile Number


Project Information

Project Name
Address
City
State
Zip
Who is the owner of record of the encroachment area?
Tax Parcel ID Number of encroachment area
Section
Township
Range
County
Nearest Intersection

Have you had contact with an Progress Energy representative regarding this project. If so, whom?
Name
Date
Department
Phone
How do you plan to encroach on the Right of Way? Describe in detail.
Project In Service Date

What type of equipment will be used on the Progress Energy Right of Way?
Dragline Ditchwitch
Bulldozer Front End Loader
Crane Other

Progress Energy rights of way may contain wood poles, concrete poles, steel poles, or steel towers. These structures are letter and number coded. For each transmission line in the project area, supply the line code for the two structures next to the project area.
Use the drop down list below to select the line code.
Line Line Code Beginning
Structure #
Ending
Structure #
1
2
3
4
5

In addition to transmission structures, Progress Energy rights of way may also contain structures of other utilities. Which utilities have structures in the project area?

City of Gainesville
City of Leesburg
City of Ocala
Progress Energy & Light
Progress Energy Distribution
Gulf Power
Orlando Utilities Commission
Seminole Electric
Sumter Electric
Suwannee Valley Electric
Tallahassee Electric
Talquin Electric
Tampa Electric
Withlacoochee Electric

Other

In addition to electric facilities, Progress Energy rights of way may also contain pipelines of other utilities. Which utilities have pipelines in the project area?

Bartow Anclote hot oil pipeline (Progress Energy)
Central Florida Pipeline Corp.
DeBary Gas Lateral (Progress Energy)
FGT Natural Gas Pipeline
Gulfstream Natural Gas Pipeline
Reliant Energy Natural Gas Pipeline
South Georgia Natural Gas Company
TECO/Peoples Gas

Other

Does this project involve the relocation of a Progress Energy Transmission Easement?
Yes        No
If yes, refer to Transmission Relocation Process for further instructions.

Does this project involve the release of a Progress Energy Trasmission Easement?
Yes        No
If yes, refer to Release of Easement for further instructions.

Will any wetlands be created or restored in the Progress Energy Right of Way?
Yes        No
If yes, provide drawing.

Will any conservation easements be created or granted in the Progress Energy Right of Way?
Yes        No
If yes, provide drawing.

Will any project lands in the Progress Energy Right of Way be dedicated to the city or county?
Yes        No
If yes, provide drawing.


Applicant's Legal Classification

State the applicant's legal classification and, if applicable, show the state in which the firm is incorporated. Please provide the company name and title and name of the person authorized to sign.

Corporation   Partnership   Sole Proprietor   Individual Florida Municipal Corporation State Incorporated
Company Name
Authorized Signer
Title
Address
City
State
Zip
Email Address
Phone Number
Fax Number


Agent

Agent's Name
Address
City
State
Zip
Email Address
Phone Number
Fax Number
Mobile Number


Project Engineer

Company Name
Representative
Phone Number
Address
City
State
Zip
Email Address


For Pipeline Projects Only

What is the length of your pipeline in the Progress Energy right of way?

What information/studies do you need from Progress Energy to conduct your mitigation studies?

Circuit Drawings (Plan & Profile)
Conductor and OHGW Classifications (Progress Energy)
Fault Current
Ground Impedance of Towers
Present and Future Loads (5 years)
Spans Between Towers (average)
Tower/Pole Configurations
Voltage (Progress Energy)

If you checked Fault Current, name the substations along the route and the substations at each end of the route.

Construction move in (CMI) date
Construction activities on the ROW will last days.

Applicant acknowledges that it shall pay to Progress Energy all expenses incurred by Progress Energy during its review and safety evaluation of the proposed underground pipeline facilities. No work may commence in our right of way until a final agreement has been executed by both parties.
Please allow a minimum of four to six months to review your project.


Applicant's Signature

Applicant's Name

Applicant's Title

Company Name


For All Applications

Application Check List

For a non-pipeline application, a check for $500.00 payable to Progress Energy.
For a pipeline application, submit two (2) checks payable to Progress Energy, one in the amount of $12,000 and one for the appropriate consultant's fee.

All applications must include;

  • Location Map
  • Project Drawing, including your landscape plan with the sprinkler layout and spray patterns, utilitiy plan, electrical plan, grading plan, lighting plan, and plan & profiles (4 sets of each). Send only the pages that depict the Encroachment Area within the right of way boundaries. The Right of Way boundaries and your improvements must be highlighted on each set of plans.
  • Aerial Map
  • Copy of Deed

No work may commence in our right of way until a final agreement has been executed by both parties.

Return Applications To
The Encroachment Representative for the Transmission Area in which your project is located.
Questions
Contact the Encroachment Representative for the Transmission Area in which your project is located.